Build the Order-to-Cash C4 Set
The six Order-to-Cash C4 examples teach one diagram per layer. This page puts them in one C4 Diagram Set and completes the picture through the product, from the same Order-to-Cash demo data: every System gets its L1 and L2, and every Service its L3.
- ✅ One set, Order-to-Cash Demo, with 25 Active diagrams
- ✅ The diagrams you imported are kept; the generator adds only what is missing
- ✅ Navigation between all 25 works with zero stored links

The walk below: every pill on the way is inferred, none is stored.
Understanding the Build
New 7.12 Three of the product's ways to make C4 diagrams work together here: the Import of Mermaid markup, C4 Dynamic on a BPM page, and Generate from Integration Landscape on an Integration. The generator never makes a Draft beside an Active diagram of the same type, scope and subject that it didn't make, so the imported examples stay as they are.
The build in four steps: the blue start, the three orange steps that add diagrams, and the green result. See Import, Generate from Integration Landscape and Diagram Lifecycle for each step.
| Source | Diagrams it adds | Count |
|---|---|---|
| C4 Dynamic on the BPM INT1337 - Order-to-Cash Flow | INT1337 - Order-to-Cash Flow — Dynamic | 1 |
| Import of the taught examples | Order-to-Cash — System Landscape, Portal — System Context, Portal — L2 Container Diagram, INT1337-RCV-Order-Incoming — L3 Component Diagram, Order-to-Cash — on servers | 5 |
| Generate from Integration Landscape on INT1337 - Order-to-Cash | The L1 of ERP, WMS and ERP-Finance (ERP — System Context and so on), their L2s (ERP — Containers and so on), and the L3 of the other 13 Services (INT1337-ENT-Order-Entry — Components and so on) | 19 |
The Integration INT1337 - Order-to-Cash has 14 Services on four Systems: Portal, ERP, WMS and ERP-Finance. Seven of the Services are the business steps of the BPM, whose four lanes are the four Domains Sales, Planning, Logistics and Finance.
What You Need
The Order-to-Cash demo data in the Repository, with its names unchanged.
Mapify licensed: C4 Diagrams and C4 Dynamic need it.
New 7.12 In your Role (see Permission Set for C4 Diagram Sets):
- Create and Modify on C4 Diagram Sets;
- read on every Repository part the diagrams show: Systems, Services, Integrations, Message Types, Endpoints and Domains;
- Create and Modify on Systems, Services, Integrations and Domains (and Contracts when they are in use), for C4 Dynamic, the generator and Promote, checked before a new set is made;
- Create on Systems, Services and Domains, for the import.
Without a right, the click answers with an error that names the missing rights.
Step 1: Create the Set
Create the Diagram Set Order-to-Cash Demo, or use an empty set. See Add or manage C4 Diagram Set.
Step 2: Generate the Dynamic From the BPM
- Open the BPM INT1337 - Order-to-Cash Flow and click C4 Dynamic in its toolbar.
- In Generate C4 Dynamic, pick the set Order-to-Cash Demo and click Confirm.
The set gets the Draft INT1337 - Order-to-Cash Flow — Dynamic, with 7 steps. See the Dynamic Diagram Example.
Step 3: Import the Taught Examples
Import the markups of the System Landscape, the Portal L1, the Portal L2, the L3 and the Deployment, each with the diagram type and scope its page names, and click Resolve All in Review & Resolve. Resolve All creates the three Persons, Customer, Warehouse Staff and Finance Officer, as Systems with a C4 Type Person: they aren't part of the demo data. Then Promote each Draft to Active.
Step 4: Generate the Rest From the Integration Landscape
- Open the Integration INT1337 - Order-to-Cash, go to its Integration Landscape tab, and click Add C4 Diagrams. The dialog Generate Architecture Diagrams opens.
- In the shared Diagram Set picker, find Order-to-Cash Demo on the All tab (type part of its name in Filter the result) and pick it: it moves to Selected (1).
- Under the diagram types, tick Context, Container and Component, and clear System Landscape and Dynamic: the set has both already.
- Click Generate.
The summary reads 19 Created and 3 Kept. The imported Portal L1, Portal L2 and INT1337-RCV-Order-Incoming L3 are Kept: they are Active diagrams of the same type, scope and subject that the generator didn't make, so it made no Draft beside them. The table below the counters names each diagram with its status, and a note says that navigation is inferred, so no links need to be created. Click Close, then Promote the 19 Drafts.

The summary after Generate: the generated names end in — System Context, — Containers and — Components, and the imported diagrams keep their own names.
The Result
| Layer | Active diagrams | Which |
|---|---|---|
| L0 System Landscape | 1 | The four Systems in their four Domains |
| L1 System Context | 4 | One per System |
| L2 Container | 4 | One per System |
| L3 Component | 14 | One per Service |
| Dynamic | 1 | The BPM's 7 business steps |
| Deployment | 1 | The 14 Services on three servers |
| Total | 25 | 0 stored links |
Walk the Set
New 7.12 Every pill is inferred when a diagram opens, from its type, its scope and subject, and each element's binding. Try this walk:
- On the L0, click Portal and follow Inside: Portal's L2 opens.
- On the L2, follow Inside on INT1337-RCV-Order-Incoming: its L3 opens.
- On the L3, follow Zoom out: you're back on Portal's L2.
- On Portal's L2, ERP sits outside the System boundary and offers its own diagrams: Context (ERP — System Context), Inside (ERP — Containers) and Dynamic.
- Follow Context to ERP's L1, then ERP's Dynamic: the 7 steps resolve in the Steps tab with no issue, each with its sender's Message Type.
See Navigation Between C4 Diagrams for every pill.